A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

select the pronoun that best completes the sentence. now that i am cured, _____ seems great! everything somebody which whom
What is the period of f(x)=sin(x)
Working together, Shawn and Hector can install a tile floor in 6 hours. It would take Shawn 9 hours to do the job alone. What is the value of r, the part of
Please i need to pass 8 grade Which commanders were best known for their success with bold attacks? Select the best answer from the choices provided. George Wa
John adams election date
how does the volume occupied by a cubic centimeter (cm3) compare with the volume occupied by a milliliter (ml)?
Ineffectiveness at the polling place on voting day leads to: a. frustration and loss of interest in voting c. understanding and loss of interest in voting b.
Gross Dometic Product(GDP) includes___ goods and services.
Line m passes through C(-2, 0) and D(1, -3). What is the equation of the line m in standard form?
paying attention to the trends that might imact your future is called