izharsarainter2991 izharsarainter2991
  • 03-12-2021
  • Physics
contestada

A forklift raises a 1,020 N crate 3. 50 m up to a shelf. How much work is done by the forklift on the crate? The forklift does J of work on the crate.

Respuesta :

Stephen46
Stephen46 Stephen46
  • 03-12-2021

Answer:

3,570 J

Explanation:

The work done by an object can be found by using the formula

workdone = force × distance

From the question

force = 1020 N

distance = 3.5 m

We have

workdone = 1020 × 3.5 = 3570

We have the final answer as

3,570 J

Hope this helps you

Answer Link

Otras preguntas

When was World War I?
A child is standing across the street from his apartment . His mother is on their balcony . The angle of elevation between the child's eyes and his mothers eyes
A pound of seedless red grapes costs $2.75. Drew must spend less than $9.35 on a bunch of seedless red grapes.Inequality:Solution:Interpretation:
What two major processes are involved in the oxygen cycle?
.is a pot holder a conductor or a insulator
A passenger on a boat moving at 1.70 m/s on a still lake walks up a flight of stairs at a speed of 0.60 m/s , as shown in the figure . The stairs are angled at
What three islands are located off the East African coast
What is the numerator or denominator of 4/5
Nadine can send or receive a text message for 15 cents or get an unlimited number for 5 dollars. Write and solve an inequality to find how many messages she can
What is the numerator or denominator of 4/5