hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

which tool would you use to measure the height of a cube of metal
Which are rights guaranteed by the Magna Carta? Choose all answers that are correct. A. All serfs throughout England were freed from any further obligation to t
Which is not determined by the type and arrangement of atoms in a mineral? A. thermal properties B. magnetic properties C. electrical properties D. its position
Kevin ran 5 miles in the race. How many yards did Kevin run? (1 mile = 1,760 yards) A. 10,560 yards B. 8,800 yards C. 1,755 yards D. 352 yards
Which word is the preposition and which word is the object of the preposition in this sentence? Our car bounced and rattled loudly over the old bridge. A. prepo
What is the perimeter of a basement floor that is 40 feet long and 24 feet wide
which numbers are from least to greatest?
a paper plate has a diameter of 9 inches.what is the circumference of the plate
What astronomical model from the Renaissance replaced the one expressed in the image above?
In right triangle ABC with the right angle at C, sin A= 2x + .1 and cos B = 4x - .7. Determine and state the vaule of x.