Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

What two numbers add up to 1 but multiply to -30
Do the technical changes of today have the same kind of impact on daily life as the changes of the early 1800s?
jan has $37.50. tickets to concert cost $5.25 each. how many tickets can she buy
Describe how cells are organized into larger and larger groups to help living things survive
what reference source would you use to find the meaning of "etiquette" this is language arts
what number is 0.5% of 8?
a biome that has a large amount of rainfall,high temperatures, and a poor soil is a
3x+4y=2 4x-4y=12 by using elimination
If an orange is orange, why isn't a lime called a green or a lemon called a yellow?
6x-5y=22 y=-8 using systems of equations by substitution