medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

The process by which rocks are broken down into smaller fragments by the atmosphere and other factors in the environment is called?
What is the change in number of individuals in a population over time? A. population decrease B. population stability C. population growth D. population resista
other name for blood
What is the lateral area of the rectangular prism? Assume the prism is resting on its base. A. 135 in2 B. 270 in2 C. 300 in2 D. 310 in2
How do u write 6 more the 7 times a number is 41 in algebraic equation??
How many eighths are there in 4 1/4
What is the lateral area of the rectangular prism with a base length of 17 m, a base width of 7 m, and a height of 5 m?
What is the lateral area of the rectangular prism with a base length of 17 m, a base width of 7 m, and a height of 5 m?
what is the cause and effect for the french citizens armies win their revolution for liberty and equality
The base of right prism is rhombus of diagonal is 6 and 8cm and altitude is 12 cm find total surface area