how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

Which letter represents the direction of the centripetal force?
Bob bought 24 hockey tickets for $83. Adult tickets cost $5.50 and child tickets cost $2.00. How many of each did he buy . Show your work .
Name some ways in which whales differ from fishes
A toddler takes off running down the sidewalk at 270 ft/min. One minute later, a worried mother runs after the child at 580 ft/min. After how many minutes will
Besides making laws, what are some other jobs of the House of Representatives and senate?
what is the Nth term of 0 3 8 15 24 35
The box office took in a total of $2905 in paid admissions for the high-school musical. Adult tickets cost $8 each, and student tickets cost $3 each. If 560 peo
What is considered the eastern border of Europe
A particular frozen yogurt has 75 cal in 2 ounces how many calories are in 8 ounces of the yogurt
In what way did the sepoy mutiny change the political climate of India