​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

What extra item does Sancho try to order? O ensalada O diet coke O malteada de chocolate
SOMEONE HELP ME ASAP PLEASE AND THANK YOU “Modern day nations should not keep themselves so isolated from other nations in the world. They should be open to le
Which Supreme Court decision ruled that Constitution protected slavery?
who got sound cloud???-Female
Find two consecutive odd integers whose sum is 96
Привет What this this means?
Describe the three main types discipline
A large company claims that the average age of their employees is 32 years, with a standard deviation of four years. The average age of employees in the sales d
After their escape, Jonas transmitted memories of snow to Gabriel when - A Asher dropped them into the raging river B Jonas drove the motori
A group of 100 students were asked if they study French or Spanish in school. The results are shown in this two-way table. A 4-column table with 3 rows. The fir