liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

Sally will earn $30 for every 5 hours that she babysits. Which of the following equations can be used to represent the proportional relationship?
What is 5:6 in fraction form
Who won the Civil war in El Salvador and how?
Boulder Company reports current E&P of $500,000 this year and accumulated negative E&P at the beginning of the year of $200,000. Boulder distributed $40
A drug that restricts the activity of angiotensin converting enzyme (ACE) would likely result in all of the following physiologic changes but one. Which of the
Horsetail has been uses to
sarah has 12 rubber band bracelets five of the bracelets are blue 1/6 of the bracelets are green the rest are red how many bracelets are red
The information that is stored in DNA is stored in the
Describe the distinctive features of Texas' cities.
Vera ordered a soup, salad, and sandwich to share with her friends. The probabilities of each item being ready first are as follows:P(Soup ready first)= 5 1 ​ s