carl105
carl105 carl105
  • 04-04-2016
  • Mathematics
contestada

what is In 7 days, a group of workers can plant 21 acres. What is their rate in acres per day?

Respuesta :

kelpel197
kelpel197 kelpel197
  • 04-04-2016
So do 21/7 to give you how much they do in a day. The answer is three so they do 3 aceres in a day.
Answer Link

Otras preguntas

Find the sum of the arithmetic sequence. 3, 5, 7, 9, ..., 21
Julian is using a biking app that compares his position to a simulated biker traveling Julian's target speed. When Julian is behind the simulated biker, he has
someone please help me!
En el grupo diez están el pan, el arroz, y el maíz. Cierto Falso
Choose the statement(s) that is/are true about Bohr model of the atom. (i) Electron energies are quantized and they can assume only certain discrete energy valu
Why electrolysis Is a redox reaction? ​
The polynomial p(x) has factors that include x, x+1 , and x-1. Match each factor to the point on the graph of p(x) that it corresponds with. 1. x 2. x+1 3. x-1
If m(x) = x3 and n(x) = √ 6 + x , find the function value, if possible. (m – n)(–5) A. 124 B. –124 C. Not a real number D. –126
The polynomial p(x) has factors that include x, x+1 , and x-1. Match each factor to the point on the graph of p(x) that it corresponds with. 1. x 2. x+1 3. x-1
the weights of cars passing over a bridge has a mean of 3550 lb and a standard deviation of 870 lb. Assume that the weights of the cars are passing over the bri